How to get a job on the Boco Rock Wind Farm Project

How to get a job on the Boco Rock Wind Farm Project


In the ‘How to get a start at …….’ series we are going to be running over Australian Mining and Construction projects all over the country.  In each post we will include an Overview of the project, a Location Profile, the Companies involved, the Occupations required, the skills / qualifications that will help you to get your foot in the door and the Enterprise Bargaining Agreements.  This will help you to stay in the loop and know how to skill up where needed.  The aim is to help you get yourself into the best position to land a start on the major sites and projects around Australia.

 

About the Boco Rock Wind Farm Project

From the Boco Rock Wind Farm website

Boco Rock Wind Farm is owned by Thai Electricity Generating Public Company Limited (EGCO). Construction of stage one of the Boco Rock Wind Farm project will comprise 67 of the 122 approved wind turbine locations encompassing the two western clusters.   A power line connecting the wind farm to the Essential Energy owned lines at Steeple Flat is also part of stage one.

Construction of the Boco Rock Wind Farm Project is due to commence in third quarter of 2013…

  • civil works for access track construction, footings and trenching for cables
  • preparation of hardstand areas
  • laying cables
  • preparation of the concrete footings
  • establishment, operation and removal of concrete batching plants
  • installation of wind turbines using large mobile cranes
  • construction of a substation and onsite power reticulation lines and cables
  • temporary site storage.
  • pre-commissioning checks on all high-voltage equipment
  • connection to the grid.

 

From the GE Website

GE today announced it had been awarded a contract with its consortium partner, Downer EDI Limited, to supply turbines, build and maintain the $350 million Boco Rock wind farm in New South Wales.

The GE-Downer consortium will provide engineering, procurement and construction. GE will supply and commission 58, 1.7MW and nine, 1.6MW wind turbine generators. With blades that extend 50 metres and an overall height equivalent to 33 stories, the 1.7-100 is GE’s latest development in wind turbine technology. Compared with the 1.6-100 wind turbine series, it has the ability to capture additional energy to boost power by six per cent, and it is the world’s most efficient wind turbine in its class.

In addition to supplying and commissioning the wind turbine generators, GE will provide around $50 million worth of maintenance services over 10 years. Downer will construct the 132kV transmission line and substation as well as provide plant, civil and electrical infrastructure.

 

Location Profile – Tumut, Southern Highlands & Snowy

Bowral, Thredbo, Tumbarumba, Mittagong, Exeter, Jindabyne, Fitzroy Falls, Perisher, Berrima, Moss Vale,  Bundanoon, Mt Kosciuszko, Tourism, Markets, Bush Walking, Cinema, Golf, History & Heritage, Horse Riding, Markets, Cycling, Museums, Shopping, National Parks, Cycling, Mountain Biking, Snowboarding, Snow Skiing, Thermal Pools, Caves, Wineries, The Man from Snowy River, Fishing, Camping

Population: 63,316 ( Southern Highlands & Snowy SA3 ABS 2011)

Tumut Shire Council

Wingecarribee Shire Council

Tumut/Southern Highlands – Rents as at Aug 2012

2 bed 1 bath – $140 – $450

3 bed 1 bath – $190 – $520

4 bed 2 bath – $320 – $650

 Tumut/Southern Highlands  – House Prices at at Aug 2012

2 bed 1 bath – $140,000 – $1.300,000

3 bed 1 bath – $148,000– $2.175,000

4 bed 2 bath – $158,000 – $3.700,000

Climate data for Bowral
Month Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Year
Record high °C 40.0 39.1 35.7 31.5 25.5 20.1 20.3 23.8 29.1 32.4 38.0 37.2 40.0
Average high °C 25.4 24.5 22.4 19.3 15.4 12.4 11.5 13.4 16.2 19.0 21.4 23.8 18.7
Average low °C 13.3 13.5 11.6 8.1 5.3 3.4 2.0 3.1 5.2 7.6 9.7 11.6 7.9
Record low °C 2.1 1.8 -0.7 -2.2 -6.3 -8.2 -11.2 -6.1 -5.7 -2.6 -2.2 -1.4 -11.2
Avg. Rainfall mm 81.6 99.0 93.4 76.8 70.9 82.7 46.5 60.2 56.7 73.5 94.9 76.1 912.1
Avg. Rainy days 13.6 13.3 13.4 11.0 11.4 11.2 10.1 9.6 10.3 12.0 13.6 12.6 142.1
Source: www.bom.gov.au

 

Companies Involved with the Boco Rock Wind Farm Project

GE & Downer EDI have been awarded the contract to supply turbines, build and maintain the $350 million Boco Rock wind farm.

GE – Supplying and commissioning the wind turbine generators.  Also GE will provide around $50 million worth of maintenance services over 10 years.
Click here to go through to GE Website.

Downer EDI – Downer will construct the 132kV transmission line and substation as well as provide plant, civil and electrical infrastructure.
Click here to go through to Downer Group website.

Cribhut Premium – For the latest announcements, Major Project, Shut-down and Even-time roster jobs

 

Occupations Required at the Boco Rock Wind Farm Project

  • Electrical Trades
  • Mechanical Trades
  • Building Trades
  • Rigging
  • Mobile Plant Operator / Truck Driver
  • Cleaning and Catering Staff
  • Crane Operators
  • Labourer / Trades Assistant
  • Health & Safety

 

Qualifications to help you get a foot in at the Boco Rock Wind Farm Project

 

Interstate Licence Recognition

A helpful tool to finding out whether your trade qualification needs mutual recognition when working interstate.
Check out the Cribhut Daily post – Thinking about Working Interstate – Licence Recognition

 

Boco Rock Wind Farm Project Union Greenfields Enterprise Bargaining Agreements

An Enterprise Bargaining Agreement (EBA) is a collective industrial agreement between either an employer and a trade union acting on behalf of employees or an employer and employees acting for themselves.

At this stage of the project no EBA’s can be found, as they are found they will be uploaded into this article.

 

Disclaimer: Cribhut provides this information with the best intentions, but purely as a guide.  Like most things in life, there are no guarantees.  Your lively hood is your own responsibility and even if following the above recommendations, it is still up to you to do your own research, to be patient, persistent and put in the hard work.

Photo Credit (daily sunny)

Cheers!

The team at Cribhut

 

Want to stay in the loop with what jobs are going around, receive 10% off training courses, read Shared Investor and go in the draw to win gear and event tickets?

For all of the above it’s just $22 per month and you can pause, resume, cancel or contact us at anytime.

JOIN CRIBHUT PREMIUM

or click here to have a look around first